10% off your first production run · Replies within 24 hours on working days

Sewing machine stitching dark fabric

What happens after you say yes: sampling and production

After you approve a quote, Gen-Z Fashion Apparel makes a physical sample in 15–20 working days. Once you approve it and pay the 50% deposit, bulk takes 20–25 working days, then a 5-stage quality check and shipping. These guides walk through each stage.

Guides in this topic

  • What happens after you approve a sample Coming soon
  • QC checks before shipping Coming soon
  • How to plan a drop calendar backwards from launch Coming soon

See every step and how long it takes

The full timeline, with a lead-time planner.

Common questions

How long does bulk take?

20–25 working days for private label and cut and sew, from deposit and sample approval.

Total time from first message to delivery?

About 8–10 weeks for a private label first order.

How do you check quality?

5 stages, photos before shipping, third-party inspection welcome.

Still unsure? Email us. A real person answers.

Get a Quote